MANILA, Philippines — The government is eyeing the filing of charges against the Discayas over poor structural design and unfinished work of the Philippine Film Heritage Building (PFHB) in Intramuros, Manila, Malacañang said Thursday.

Palace Press Officer Claire Castro discovered the sloppy construction of the film center during her inspection of the PFHB that was supposed to be completed Sept. 4, 2025.
Castro said the PFHB was built by the Discaya-owned Great Pacific Builders and General Contractor Inc.
"This building should be turned over now because that it's supposedly finished, Sept. 4, 2025. We can see now how it's built and why it's disappointing," Castro told reporters after inspecting the film center., This news data comes from:http://avbr-rci-pde-oqr.052298.com
"And this building, its contractor is Great Pacific Builders and General Contractor Inc. This is one of the corporations of the Discayas," she added.
Govt eyes charges vs Discayas over 'unfinished' PH Film Heritage Building
- Nartatez vows fair assignments, better resource management as new PNP chief
- Indonesia hosts annual US-led combat drills with Indo-Pacific allies
- MMDA prepares for PH hosting of FIVB
- Madagascar welcomes home skulls of Indigenous warriors taken by French colonial troops 128 years ago
- Co out of country for medical reasons
- No winner in Ultra, Megalotto draws for Aug 29
- Floods kill over 30 in Indian-controlled Kashmir, displace 150,000 in east Pakistan
- Gaza at 'breaking point,' says UN food agency chief after visit
- Lacson to Marcoleta: I don’t want a fight but I won’t back down from one
- ‘God’s Influencer’ to become first millennial saint